Realtime National Passenger Train Stats

Thursday, 19 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 23:39:56

On Time

17575

80.3%

Late

4324

19.7%

Cancelled / Very Late

1377

6.3%

Total

21899

 

National PPM

80%

Rolling: 79%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

97.8%

Late

2.2%

Cancelled / Very Late

0.5%

Total Trains

596

PPM: 97%

Worst Performing Operator

Grand Central

On Time

10.5%

Late

89.5%

Cancelled / Very Late

68.4%

Total Trains

19

PPM: 10%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 216 87 9 303 71% 61%
c2c 153 181 118 334 45% 5%
Caledonian Sleeper Limited 4 0 0 4 100% —
Chiltern 308 13 0 321 95% 92%
CrossCountry 138 132 79 270 51% 56%
East Midlands Railway 402 86 23 488 82% 89%
Elizabeth line 927 96 23 1023 90% 95%
Grand Central 2 17 13 19 10% 0%
Great Western Railway 1369 281 65 1650 82% 82%
Greater Anglia 1137 117 24 1254 90% 94%
Greater Thameslink Railway 2479 764 278 3243 76% 81%
Heathrow Express 128 20 5 148 86% 93%
Hull Trains 9 5 3 14 64% 100%
London North Eastern Railway 49 136 111 185 26% 35%
London Overground 1414 135 46 1549 91% 91%
Lumo East Coast 2 9 9 11 18% —
Lumo West Coast 9 1 0 10 90% 100%
Merseyrail 583 13 3 596 97% 97%
Northern Trains 1859 745 177 2604 71% 77%
ScotRail 1772 404 163 2176 81% 78%
South Western Railway 1354 234 31 1588 85% 94%
Southeastern 1370 366 42 1736 78% 57%
TransPennine Trains 153 143 83 296 51% 53%
Transport for Wales 883 132 54 1015 86% 85%
West Midlands Trains 1005 259 48 1264 79% 86%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 22 5 5 27 81% 100%
DB Cargo 98 19 0 117 83% 90%
Direct Rail Services 23 5 0 28 82% 75%
Freightliner Intermodal 34 12 0 46 73% 66%
GB Railfreight 92 20 1 112 82% 92%
Heavy Haul Rail 73 6 0 79 92% 91%
Network Rail - Materials 82 19 0 101 81% 50%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo